Name : PEYYETTI SRINIVAS RAO
Job Category : Others
Qualification : BE MECHANICAL, PGDBM
Work Exp : 12 YEARS
Expected Salary :
Address : C/o k GHAYAL KOPRI COLONY, PARSHIWADI, THANE
City : MUMBAI
State : MAHARASTRA-400067
Email Id : srinivasrao26febp@gmail.com
Contact No. : 9224381064
Profile Description : EXPERIENCE IN PROJECT EXECUTION OF AIR POLLUTION
EQUIPMENTS AND OTHER ERECTIONS LIKE HAVOC AND
COMMISSIONING.
NOW INTRESTED IN ESTIMATION AND COSTING OR SALES.
RESUME
PEYYETTI SRINIVAS RAO
S/o: P.N.VASUDEVA.RAO
Professional experience gained: 17 Years.
Takkar Nagar, OM Apartments,
Email: srinivasrao26febp@yahoo.co.in
Flat No: 204, Pathanpura,
Local Add: C/o Kiran Ghayal, Adke
Post: Chandrapur – 442402
Chawl, Kopri colony, Parshiwadi,
Tel. No: 07172- 654107
Thane (east) Maharastra. Pin: 400603
Mobile No: 9272565130 Mobile
No: 9892949765
ACADEMIC QUALIFICATIONS
PGDBM(62%) of Annamalai University,
“Directorate Of Distance Education”.
B.E( mechanical) (55%).”Chandrapur
Engineering College” Chandrapur.
HSC(65%). from Guru Nanak College of
Science, Ballarshah. of Nagpur Board.
SSC(55%). from Thapar High School.
Ballarshah under Nagpur Board.
Computer Proficiency
Modeling Packages :
AutoCAD 14/2000.
Operating System :
Windows 95/98/XP.
WORK EXPERIENCE
Organization : Elixir Engineering Pvt. Ltd.
Goregaon, Mumbai
Department : Projects
Designation : Project Manager
Period : 20th August 2010 to till
date
Key Responsibilities
• Projects execution as per supply schedule.
• Communication with client and preparing
schedule for project execution.
• Vendor sourcing and procurement of tools.
Organization : Batliboi Environmental
Engineering Ltd. Govandi, Mumbai
Department : Air Pollution Control Equipment
Designation : Project Executive (Asst.
Manager)
Period : 1st December 2006 to 23rd
December 2010
Key Responsibilities
Project Planning and Scheduling.
Preparation of Data Sheets based on
Technical specifications.
Inspection of drawing layouts and General
arrangements drawings in AutoCAD
Procurement of materials, components &
equipments.
Vendor sourcing and developments.
Controlling sub-vendor works & ensure
adherence to the time schedule.
Preparation of Control & Operation
Philosophy.
Project Monitoring, Co-ordination &
expediting the execution.
Co-ordination with Q.A. Dept for inspection
and obtaining clearance to dispatch
Coordination with Client and Commercial
Dept for commercial issues.
Co-ordinate site activities. Preparing FQP
for approval.
Executing of Project with a good team work.
Preparing MOM for every visit and
negotiation with client and contractors.
Hand over of project to client with
warrantee of equipments.
Organization : Glasspaane Aluminium India
Ltd. Mulund, Mumbai
Department : Projects
Designation : Project Engineer
Period : May 2006 to October 2006
Organization : Japro Engineering Pvt. Ltd. Thane
Mumbai
Department : Projects
Designation : Project In-charge
Period : 17th March 2005 to 30th
April 2006
Key Responsibilities
Study of drawing with P&I Diagram of
Project.
Inspection of material while fabrication
and workshop before dispatch.
Supply of material as per site requirement.
Erection of Equipments as per approved
design ensuring quality and safety standard.
Inspection of incoming and outgoing
material from vendor side and client side.
Inspection of incoming and outgoing
material from vendor side and client side.
Participation in pre-commissioning and
commissioning activities.
Organization : Bharat Prelam Industries Limited.
Itarsi
Department : Production
Designation : Shift In-charge
Period : 17th April 2001 to 16th
April 2005
Key Responsibilities
Preparation for activity chart for
achieving daily and monthly target.
Managing daily manpower and raw material
for production.
Check of surface finish of laminated
boards.
Check of temperature and pressure of
theater plant for resin preparation.
Check of leakages in Lancashire boiler of
20 Kg/cm2 at 1800C.
Weekly maintenance of all type of drives
and equipments.
Organization : Vijaya & Company Hyderabad
Department : Production
Designation : Work Administrator
Period : 7th March 1994 to 16th
April 2001
Key Responsibilities
Handling labour in coal mines for lifting
of over burden to extract coal.
Administering welfare of drivers, cleaners,
mechanics with lodging and boarding.
Educating staff for implementing mines
safety rules in daily activities at work place.
Co-coordinating with mine officials, survey
office and head quarters for bills.
Maintenance of mine machinery like
excavator, tippers and water tanker.
1. FABRICATION
Fabrication of structure, ducting with
supports as per drawing.
Fabrication of dust collector systems like
bag filter, cartridge filter casing & ESP.
Fabrication of wet scrubber, quenching
chamber, cyclone for fume exhaust.
Fabrication of spark arrestor, tanks &
stack of 48mtr for SISCOL (JSW).
2. ERECTION
Erection of tanks, silos and winnowing
columns & chutes, stacks, bag filters. ESP, ducting
with supports & structural platform, pipeline for
water, steam, oil and compressed air as per design
drawing.
Erection of heavy rotating equipments like
twin-screw press, sludge separator stripper, nut
polishing drum, purified centrifuge, vacuum pump,
oil storage pump, sludge pump, reclaimed oil pump,
recycle oil pump, vacuum dried oil pump, crude oil
pump & effluent transfer pump.
Erection of heavy vessels like vertical
clarifier, sterilizer.
Erection of ID fans, FD fans & blowers with
static & dynamic balancing.
Erection of slat conveyor, screw conveyor,
bucket elevators & belt conveyor.
Erection of 40lb railway track with
shunting facility & push pull winches.
Excavation of ETP pond for recycling of
waste water.
Erections of 50 ton weigh bridge with eight
load cells of “Avery Systems”.
3. COMMISSIONING
Commissioning of bag filter and I.D Fan for
BHEL, FL Smith, Tata Chemicals.
Commissioning of DE system for D-
Sulphunization plant in Bhilai Steel Plant.
Commissioning of gas cleaning plant of 60
Tons EOF (Energy optimizing furnace) in “SISCOL,
JSW” (TN).
Commissioning of 80000m3/hr DE system in
“Kalyani Steel” Hospet (KA).
Commissioning of 20 MT/hour palm oil plant
for “Food Fats & Fertilizers Limited”
Tadepalligudam (AP).
4. POST COMMISSIONING
Achieving production of 20 Tons/hr fruit
processing for six months.
Weekly maintenance of all machines in
particle board industry like chippers, driers,
fans, blowers, silos, variable drive motors,
hydraulic power pack of 1000 Tons press, De-sanding
machines and Lancashire boiler of fire tube.
PERSONAL DETAILS:
Date of Birth :
26.02.1966
Languages Known :
English, Hindi, Marathi, and Telugu
Other Abilities :
Marketing of product to clients,
Last Salary Drawn : 6.5
lakes per annum
Expected Salary :
8.0 lacs per annum
Place: Mumbai
Date: 27.04.2011
Yours Truly
(P.Srinivas.Rao)