Name : PRADEEP KOLTE
Job Category : Others
Qualification : I.T.I. from Nagpur in Instrumentation
Work Exp : +20 YRS
Expected Salary :
Address : 10/2 snehankit building D.NC.Road,behind Leva bhavan,Ramnagar
City : Dombival(E)
State : MAHARASHTRA-421201
Email Id : prardeep_kolte@rediffmail.com
Contact No. : +919096243010
Profile Description : Pradeep Nivrutti Kolte
Address:
Email: pradeep_kolte@rediffmail.com/koltepradeep@yahoo.com Flat.10/2nd flr. Snehankit Building,
Mobile: India: +91-9096243010 Prakash Housing Society,
KSA.. +966-551635010 Plot 8, Nr Leva-Bhavan, DNC Rd,
Ram nagar Donbivali (East )
Dist Thane (M.S) 421201 INDIA
Sub: seeking assignments in Project Management- post of Instrumentation Engineer/ Supervisor
CAREER PROFILE:
Having 20+ years of experience in the field of Instrumentation, Automation & Electrical.
Want to contribute my strong problem solving & technical skills in Construction, Commissioning & Maintenance project works.
Personal Profile:
Technical Qualification: Instrumentation, Vocational Diploma from Govt. of India, Industrial Training Institute, Nagpur (M.S) India.
Special Course/Training Complected:
Training in Page/Party (Paga) communication system of Philips India Limited, Pune, India.
Date of Birth : 1st July, 1959
Nationality : Indian
Marital Status : Married
Language Known : English, Hindi, Marathi
Passport No : E-8696074(Validity upto 2014)
SUMMARY OF PROFILE AND SKILLS:
Adequate experience of Projects, Planning & Inventory control in Oil & Gas, Steel & Cement.
Effective resource planning for optimizing man & machine utilization, reducing wastes for enhancing productivity and profitability.
Commissioning of Process Controls & Instrumentation.
Instrumentation & Control System:
Flow Instruments: Mass flow meters ,Turbine flow meters, Rota meters etc; Orifice, Ventury, Annubar and Pitot tube with conventional and smart type DP Transmitters such as Rosemount (3051 series), Honeywell, Yokogawa, Endress-Hauser, Foxboro, Krohne etc.
Pressure Instruments:Pressure & DP transmitters i.e.Rosemount (3051series)Gauge, Switches. Level Instruments: Rosemount (3051series)DP Wet & Dry leg,Ultrasonic, Radar, Displacement type ( Top & Side mounted) including Smart type,Necleanic,Level Gauges & Capacitance & Flot operated Level Switces of Magentrol,Mobery.
Temperature Instrument:Types R,S,J,K Skin,Slip-Ring,Thermocouples,Pyrometer,RTD,Switches. Final Control Elements: Globe, Check, Butterfly, V-ball type control valves of Masoneilan, Fisher, Valtek, Flowserve with its accessories such as I/P of Foxboro, Masoneilan, Fisher, Metso.
MOV’s such as Rotork, Limitork, Flowserve.
Automation & Control Systems: PLC Allen-Bradley Controllogix 5000, Siemens S7/400.
ESD Yokogawa Centum-3000, Foxboro System. DCS Yokogawa, Foxboro System.
Security System: C.C.T.V, Fire Protection, Page & Party (PAGA), Fire & Gas System.
Computer: MS Office & Outlook.
Professional Experience (Gulf )
Since June 2007 to till working with M/S Gulf Consolidated Contractors Co Ltd, Dammam K.S.A as a Instrumentation Supervisor.
Presently working in New Project of SATROP,Coke Storage Jubail Export Refinery, Abuhadariya.
Work- Duration : Jan to July 2011.
Position : Instrument Supervisor
Company : M/S.G.C.C.Co Lld , Saudi Arabia.
Site : DHRB(Increase Capacity Finish Product, Pipe-line)Aramc Project,Dharan.
Main Duties:
New Shipper pumps related instrumentation loops packages preparation, as build ILD,S & Supporting documentation, for Instrument & Control of Pressure, Flow, Level Temperature Transmitters of Rosemount Series 3051, Foxboro, Switches & Gauges.
Instrumentation Loops Checking, Function Test, & Setting, Trouble shooting, coordinating with vendors & Client during Commissioning, for start-up the Shipper Pumps. Optional (Punch) item clearing as per Aramco standard. Rotork ZV,S(Electro-hydraulic type),Control Valves, Adjustable frequency Drives & PLC Step7/400 of Siemen system. Attended Aramco shutdown/breakdown for Final Cut-Over Plan. Same time associated with Aramco commissioning activities for existing Pumps, XVE & RTD,S Loops cables disconnected from existing cabinet & terminated to new system cabinet & transfer existing VMS & Common Loops to new Vibration Monitoring system cabinet & Interfacing done with existing ESD-MP to new ESD-MP, Also new VIB cabinet to existing PLC-MP.
Work - Duration : April 2008 to May 2009.
Position : Instrument Supervisor.
Company : M/s.Saipem S.A.Ltd,Dammam
Site : Khurais water injection pump station, Aindar Saudi Aramco.
Main Duties :
Deputed through G.C.C.for job execution through Sub-Contractor & Vendors for Construction &Commissioning.
Gai - tronics (Paga), Fire Protection (Simplex), Fire & Gas (Promel) Security system.
Close Circuit T.V.(Pelco) security system.
Turbine Control (Mark-VI) TMR PLC.
MOV (Flowserve)/ ESD/DCS (Foxboro) Invensys system.
Vibration Monitoring (Bentley – Nevada) system.
Instrument loops exceptional items clearing as per standards.
Instrument loops folders preparation with SAT/FAT reports.
Coordinating with venders for Hot & Cold Loops checking, Function Test of Process Variables Instruments
Providing as-build ILD, IFC, Drawing & sometimes made Technical Query.
Walkthrough & Inspection with Saudi Aramco & Sub-Contractors work progress report for start-up their Gas Turbines. Material follow-up from Store & Procurement.
Control Valves: Flowserve, & Fisher, Masoleinin.
Work - Duration : June 2007 to March 2008.
Position : Instrument Supervisor
Company : G.C.C.Ltd,Dammam.
Site : Hawiyah N.G.LT..Gas Recovery Plant,Saudi Aramco K.S.A.
Main Duties :
Loops folders preparation with FAT, SAT & related documentation as per standard.
Updating ILD,S junction box, P&IDs drawing, also supervised for Loops checking’s associated with Vendors & Clients, Yokogawa DCS CS-Centom-3000, Foundation Field Bus, ESD of Trico nix.
Worked in Pre-commissioning dept. for exceptional items (Punch) clearing for Process Instrumentation i.e. Pressure, Flow, Level & Temperature Transmitter Series YTA & EJA of Yokogawa, Gas detectors (H2s,LEL) Flame Sensors, Electrical Igniters, Flowserve, Fisher of Control Valves, M.O.V, & ZVS, 3500 Vibration Sensors, Switches of Bentley-Nevada.
Professional Experience (India)
Work - Durations : June 2004 to May 2007.
Position : E&I Supervisor (Shift-In Charge)
Company : Bhushan Steel & Strips Ltd,
Site : Khopoli, Navi Mumbai.(M.S.) India.
Plant Process Summary: Successful Commissioning of Nox-Ox Galvanizing line with Flat Products GALVALUME supplied by Ajox-Tacco (Sumitomo) U.S.A. with flowing facilities:
Inductive Pot Furnace with online Pot Changing facility.
Non-Ox furnace with vertical socking zone, On-Line 4HI Skin –Pass Mill.
Main Duties:
Work role in shift duties to attend related break-down, shut-down & Periodic/Preventive maintenance of Electrical & Instrumentation Equipment’s.
Electrical Inductors, Motors, PCC, MCC, Allen-Bradley PLC, A/C Drives, SCADA RS-View Studio. Process Instrumentation i.e. Pressure, Flow, Level & Temperature, Transmitter of Rosemount 1151,
Automatic Gas, Fire Burner Monitoring system, Masoleinin ,Demala, Fisher Control Valves.
Chicago Radio Intrasite (Motawani) Paga Communication System.
Work- Duration : July 1988 to Aug.2002.
Position : Instrumentation Foreman (Shift-In Charge)
Company : M/S Sunflag Iron & Steel ltd,
Site : Bhandara Rd, Nagpur (M.S.) India.
Plant Process Summary:
SUNFLAG is a Integrated Steel Plant having Steel Melting Shop capacity: 750 M.T./Day.
Sponge Iron (Direct Reduction)Plant Capacity :750M.T./day.
Bar & Section Mill Capacity: 1000 M.T./Day, Captive Power Plant capacity: 15 MW.
Main Duties:
Work role in shift duties to attends Preventive/Periodic Maintenances, Break-downs, Shut-down of Process Instruments Calibration & Commissioning of Rosemount, Siemens, Taylor Transmitter i.e. Pressure, Flow, Level & Temperature, Gas Analyzers/CO2, Liquid Metal Temp &O2 ppm measuring with Celox lancing, N2 Gas purging, for Liquid Metal Mold Level Control, Kiln Cell Temperature (with slip ring) measuring System,Arca Control Valves ,Weigh-Feeders, Belt Weighers Calibration & Maintenance.
PCS, Siemens PLC,s :110S,115 U,135U,150U S5 675, experience of operation & Maintenance .
Operation & Maintenance experience of Tata-Telecom, Paging system of Philips India ltd. Pune.
Work- Duration : August 1985 to May 1988.
Position : Instrument Technician.
Company : M/S Vasavadatta Cement ltd,
Site : Sedam, Dist. Gulbarga (K.S.) India.
Plant Process Summary:
Integrated Dry Cement Plants having Vertical Coal Mill,Raw Mill,Horizontal Kiln & Cement Mill with Packing Plant,Capacity :1500 T.P.DAY.
Main-Duties: Work role in shift duties to attend Problems, Break-downs, Process Instruments i.e. Pressure, Level, Flow, Temperatures Transmitters like Siemens,Taylor,I.L.Kota, Analyzers, Actuators, Control Valves, Weigh Feeders System,Calibration, Operation & Maintenance.
DECLARATION
I hereby declare that all the information given above are true and correct to the best of my knowledge and belief.
Yours Faithfully Date : ………
(Pradeep Kolte) Place : Dammam
Note:Dear sir,
Greeting,
As,i am seeking a job in instrumentation field in construction of steel industry in india or abroads, my contract is completing in 20/12/2011 afterwards avilable in india for 45 days, if you have any vacancies please be informed by mail ot cellphone.