The Delhi Metro has been roped in to construct the 1005.6-metre stretch — partly at grade level and partly at underground — as the construction process involves sophisticated tunneling through the cut-and-cover method.
985
1064
7900
0
1830
3660
3773
5389
539
1599
4599
9999
27000
0
6449
12899
3416
6832
399
1999
8209
16399
299
999