The Delhi Metro has been roped in to construct the 1005.6-metre stretch — partly at grade level and partly at underground — as the construction process involves sophisticated tunneling through the cut-and-cover method.
1299
1700
5749
11499
1170
1999
3070
4913
749
1999
4526
7242
499
600
2519
4300
141
299
2049
4099
3589
7199
299
1199
19911
0
7150
10219
199
249
299
2899