The Delhi Metro has been roped in to construct the 1005.6-metre stretch — partly at grade level and partly at underground — as the construction process involves sophisticated tunneling through the cut-and-cover method.
1081
1299
3139
6299
4423
8256
19000
0
1699
2499
4199
5599
825
1999
199
299
199
599
4993
6657
2375
5000
1099
2960
989
1999
5999
11999
189
1499