This sinter unit is expected to increase the steel plant's hot metal capacity from the current level of two million tonnes per annum (mtpa) to 4.5 mtpa.
The new single strand sinter plant will have an annual production capacity of 3.70 mtpa of gross sinter. A consortium of L&T and Outotec, a Germany-based firm is the technology supplier of the project.
284
1250
5169
10299
9590
19199
749
1499
573
708
449
999
5159
10299
5853
0
199
2999
8519
16999
377
676
3299
4499